Project Title:
Supply and Installation of Lightning Protection System based on NFPA780 & BNBC Standard.
Client:
Paragon Feed Mill Ltd. (Paragon Group)
Location:
Kakarkandi, Nalitabari, Sherpur
Project Duration:
May, 2025 to July, 2025
Project Value:
21.20 Million BDT.
Scope of Work:
Supply, installation, testing, and commissioning of conventional lightning protection system for entire factory complex. Approximate 13 thousand meter of copper conductor, 980 or air termination device, 60 Lightning elevation pole, 206 set of earthing system was installed. After completing the installation prepare the as-built design, measuring the earth resistance, commissioning the site was included in this project.
🔧 Key Deliverables
-
Proposed Design for LPS as per NFPA780 & BNBC
-
Installation of Air-Termination Network.
- Installation of Down-conductors.
-
Installation of Earthing System.
- Earthing resistance test and commissioning of site.
- Preparing the as built design and other documents.
🛠️ Technical Specifications
- Type of Lightning Protection System : Conventional Meshed Conductor
- Lightning Protection Standard: BNBC2020 & NFPA780
- Major of Materials in used : Copper, Brass, SS-Steel, & Aluminum
- Earthing Type : Conventional Copper Electrode.
- Earthing Inspection Pit: RCC Earthing Pit with RCC Slab.