Supply and Installation of LPS at Shalbahan Farms Ltd. U-2

,

Portfolio

Description

Project Title:
Supply and Installation of Lightning Protection System based on NFPA780 & BNBC Standard.

Client:

Shalbahan Farms Ltd. Unit-2 (Paragon Group)

Location:

Kaliakoir, Mouchak, Gazipur

Project Duration:

Jan, 2026 to Mar, 2026

Project Value:
3.50 Million BDT (With Earthing System).

Scope of Work:
Supply, installation, testing, and commissioning of conventional lightning protection system for entire factory complex. Approximate 2 thousand meter of copper conductor, 450 or air termination device, 6 Lightning elevation pole, 36 set of earthing system was installed. After completing the installation prepare the as-built design, measuring the earth resistance, commissioning the site was included in this project.


🔧 Key Deliverables

  • Proposed Design for LPS as per NFPA780 & BNBC

  • Installation of Air-Termination Network.

  • Installation of Down-conductors.
  • Installation of Earthing System.

  • Earthing resistance test and commissioning of site.
  • Preparing the as built design and other documents.

🛠️ Technical Specifications

  • Type of Lightning Protection System : Conventional Meshed Conductor
  • Lightning Protection Standard:              BNBC2020 & NFPA780
  • Major of Materials in used :                     Copper, Brass, SS-Steel, & Aluminum
  • Earthing Type :                                              Conventional Copper Electrode.
  • Earthing Inspection Pit:                            RCC Earthing Pit with RCC Slab.